Portsmouth Water Division Releases September 2017 Water Supply Status Report

September 14, 2017

Every month, the Portsmouth Water Division issues a Water Supply Status Report to customers that provides a detailed assessment of the current water supply conditions. The September report details that while precipitation is still slightly low based on seasonal averages, the groundwater levels, reservoir levels and river flow rates are within typical ranges for this time of year. Therefore, no water use restrictions are being enforced at this time.

PW

Work to start on Walker Bungalow Road and Sudbury Street on Monday, September 18th

September 14, 2017

On Monday, September 18th, work will begin on both Walker Bungalow Road and Sudbury Street.

On Walker Bungalow Road, the City’s contractor, John H. Lyman and Sons, will be constructing a water main replacement in the area just north of Shaw Road where utility crews stopped work last fall. The project proposes to install about 280’ of new water pipe in the area – spanning from 137 to 189 Walker Bungalow – in order to eliminate this final section of old water main.

PW

Portsmouth LED Street Light Project 95 Percent Complete

September 8, 2017

Since April, the Department of Public Works has been working with Eversource and Affinity LED Lighting to assist in converting all of its high pressure sodium (HPS) street lights to Light Emitting Diode (LED) lights. With this citywide implementation, the City will experience further reductions in energy consumption, costs and light pollution, along with improved visibility and safety on the roads.

PP

Groundbreaking Ceremony for Foundry Place Garage to be held Wednesday, September 6th

September 6, 2017

PORTSMOUTH, NH – A groundbreaking ceremony to celebrate the beginning of the Foundry Place Garage construction will be held on Wednesday, September 6th at 4:00 p.m. The public is welcome to join members of City Council, City committee members (Garage Building Committee; Economic Development Committee), project representatives (Walker Parking Consultants; Consigli Construction Co., Inc.; Tighe & Bond; DeStefano Architects) and City staff to celebrate the start of developing Portsmouth’s new 600-space garage and subsequent revitalization to the City’s North End.

COP

Vaughan-Worth-Bridge Strategic Planning Committee to Host Abutter and Business Owner Listening Session

August 29, 2017

The Mayoral Appointed Vaughan-Worth-Bridge Strategic Planning Committee will host a public Listening Session for Abutters and Business Owners on Tuesday August 29, 2017 at 3:00 p.m. at The Music Hall Loft at 131 Congress Street. Abutters and Business Owners impacted by the reuse of the Bridge Street Lot, Worth Lot and Vaughan Mall are encouraged to attend. The Committee’s first listening session was held for the general public in June.

WA

Leak Adjustment Application

July 1, 2017

The City of Portsmouth offers consideration for a one time sewer adjustment to customers based on unusual water consumption at their property. As sewer charges are based on the water consumption, any adjustment approved would only be applied to the sewer portion of the customer's account.

WA

Portsmouth Water Division Releases Annual Drinking Water Quality Reports

June 26, 2017

Each year, the Environmental Protection Agency (EPA) requires community water systems to deliver a Consumer Confidence Report – also known as an Annual Drinking Water Quality Report – to their customers. These reports, which are mailed out to water customers by July 1st, provide information about their drinking water quality including a summary of detected contaminants from the previous year, compliance, and educational information.