Skip to main content
  • City of PORTSMOUTH NH
  • Department of Public Works
A A A
Department of Public Works
  • Operations Back Copy Created with Sketch.
    • Engineering
    • Geographic Information Systems
    • Parks & Greenery
    • ParkPortsmouth
    • Recycling Center & Solid Waste
    • Roads & Sidewalks
    • Stormwater
    • Transportation
    • Wastewater & Sewer
    • Water
  • Services Back Copy Created with Sketch.
    • Snowstorm Parking Info
    • Recycling Center
    • Waste Collection Schedule
    • Drinking Water Quality
    • Mosquito Control
    • Household Hazardous Waste Day
  • Resources Back Copy Created with Sketch.
    • Adopt-A-Spot
    • Billing Information
    • Catch Basins & Fire Hydrants
    • Permits & Applications
    • Portsmouth Click N' Fix
    • Post-Closure Landfill Monitoring
    • Water & Sewer Assistance Program
    • Snow Related Impacts & Notifications (CodeRED)
    • Water Efficiency Rebate Program
  • Projects Back Copy Created with Sketch.
    • Citywide Map
    • Bartlett Street
    • Capital Improvement Plan
    • Congress Street
    • Community Campus
    • Community Policing Facility
    • Edmond-Woodbury
    • Elwyn Park Sidewalks & Traffic Calming
    • Elwyn Road
    • Elwyn Road Side Path
    • Fleet Street Sewer Separation
    • Hampshire & Essex
    • Hanover Garage
    • Islington Creek
    • Lafayette Park
    • Mechanic St. Pump Station
    • Middle/Miller/Summer St
    • Pease Water
    • Pease WWTF
    • Peirce Island WWTF
    • Peirce Island Road Resiliency
    • Peirce Island Outdoor Pool
    • Peverly Hill Road
    • Rail Trail
    • Rte 1 Bypass-Coakley Intersection/Cate St. Bridge
    • Sidewalks
    • Sound Barriers
    • South Mill Pond Playground
    • Vaughan Mall
    • Woodbury Ave.
    • Other Projects
  • MapGeo
  • Contact
  • Developments
  • City of Portsmouth
  • Public Works Home
  • Middle/Summer/Miller Intersection

Middle/Summer/Miller Intersection

Go to the final design plans for the intersection. Please note that due to issues encountered in the field during construction, minor modifications were made to some of the crosswalks, tip down ramps and pavement markings to ensure compliance with ADA standards. A final “As-Built” plan will be posted on this page once the project is completed. This “As-Built” plan will include the changes made in the field during construction.

This project includes the realignment of the intersection to provide safer, slower travel and better sight distance. The plan is to replace the existing outdated traffic signal equipment with a new signal that meets current design standards. New mast arms, signal heads, pedestrian signals, accessible curb ramps, signal detection and signal controller will be included. Modifications to the pavement markings and lanes are also proposed.

This project and the three design alternatives was discussed at the November 29, 2023 Parking & Traffic Safety Committee meeting. Go to the P&TS meeting packet for details. Go to the design concepts.

Estimated Cost: Design: $55,000. Construction:  $398,000

Contractor: Electric Light

Project Manager:         

Eric Eby
City Engineer – Parking, Transportation, and Planning
603-766-1415
ebeby@portsmouthnh.gov

  • City of PORTSMOUTH Home >
blue public works seal

Department of Public Works

Home Office
680 Peverly Hill Rd, Portsmouth, NH 03801
Hours

Monday – Friday 7:30 AM - 3:30 PM

Phone
(603) 427-1530
Fax
(603) 427-1539

Resources

  • Drinking Water
  • Forms & Permits
  • Click N' Fix
  • Contact
blue public works seal

© 2026 - City of Portsmouth. All Rights Reserved. | Terms of Use | Disclaimer