Skip to main content
  • City of PORTSMOUTH NH
  • Department of Public Works
  • Wastewater & Sewer
A A A
Wastewater & Sewer
  • Projects
  • Collections Back Copy Created with Sketch.
    • Fats, Oils and Grease
    • Combined Sewer Overflows
    • Sewer Collection System
    • Wastewater Pumping Stations
  • Treatment Back Copy Created with Sketch.
    • Peirce Island Wastewater
    • Pease Wastewater
  • Resources
  • Meetings
  • New Service
  • Contact
  • COVID Samples
  • City of Portsmouth
  • Public Works Home
  • Wastewater & Sewer
  • Projects

Projects

 

Fleet Street Reconstruction Project

The City of Portsmouth is working on the preliminary design and field work for the Fleet Street Reconstruction Project.  This project will include replacement of the underground utilities and reconstruction of the roadway and sidewalks on Fleet Street.  The City hired Portsmouth-based engineering consultant, Underwood Engineers, to complete this work.

While the project is focused on Fleet Street from Hanover Street to Court Street, a larger area will be studied in the initial phases of engineering so that the utilities and other improvements can be properly designed.
Learn more on the project web page.



Sagamore Avenue Sewer Extension Project

In accordance with a September 2016 Peirce Island WWTF Consent Decree the City has constructed a sewer extension project to extend public sewer service to approximately 88 properties in the area of Sagamore Creek at Sagamore Avenue.
Learn more on the project web page.
 

 

Union Street Reconstruction

This project includes the reconstruction of Union Street from State Street to Middle Street as part of the City’s continued sewer separation to reduce combined sewer overflows. The work included roadway reconstruction, replacement of sidewalks, utility work including new storm drains, separate sanitary sewers and water mains. The project design scope was expanded to include sewer separation in the Willard Avenue area. 

Project Fact Sheet
Project Status Preliminary Design
Designer CMA Engineers, Inc.
City Staff Contact Zachary Cronin, Assistant City Engineer
 (603) 610-7304
 zmcronin@cityofportsmouth.com

 

Heritage Avenue Pump Station Replacement

The Heritage Avenue Pumping Station is a small wastewater pumping station that is in need of an upgrade. The upgrade will replace equipment that has outlived its service life and address safety issues.

Project Fact Sheet
Project Status Design
Designer Wright Pierce Engineering
City Staff Contact Zachary Cronin, Assistant City Engineer
 (603) 610-7304
 zmcronin@cityofportsmouth.com

Contract 1 Sewer Rehabilitation

The City is utilizing data collected from the sewer system infiltration/inflow study to rehabilitate sections of the sewer infrastructure. This work will focus on areas the study found to have excessive infiltration to lessen the amount of groundwater entering the sewer collection system. Infiltration is groundwater that enters the sewer system through leaking manholes and cracked or damaged pipe and inflow is both stormwater and groundwater that enters the sewer system through direct connections such as sump pumps, basement drains, yard drains, catch basins, and rooftop drains. The majority of construction will take place from inside the pipes and manholes (considered “trenchless construction”).

Project Fact Sheet
Project Status Preliminary Design
Designer Woodard & Curran
City Staff Contact Zachary Cronin, Assistant City Engineer
 (603) 610-7304
 zmcronin@cityofportsmouth.com

Pease Wastewater Treatment Facility Upgrade

The Pease Wastewater Treatment Facility (WWTF) is the smaller of the two City owned treatment facilities and is located at the Pease International Tradeport. This project will upgrade the Pease Wastewater Treatment Facility to address treatment capacity limitations based on projected buildout of the Tradeport for both domestic and industrial customers. Learn more on the project web page.

  • City of PORTSMOUTH Home >
  • Department of Public Works >
Portsmouth, NH - City Seal

Wastewater & Sewer

Facility
680 Peverly Hill Rd, Portsmouth, NH 03801
Hours

Mon – Fri 7:30 AM – 3:30 PM

Phone
(603) 427-1530

Public Works Operations

  • Roads & Sidewalks
  • Grounds Maintenance
  • Wastewater & Sewer
  • Water
  • Park Portsmouth
  • Transportation
  • Stormwater
  • Geographic Information Systems
  • Solid Waste & Recycling
Portsmouth, NH - City Seal

© 2024 - City of Portsmouth. All Rights Reserved. | Terms of Use