Pavement Management

Construction Updated July 27, 2026

Project Overview

(CIP TSM-94-PW-78 pg. 151-52) The Pavement Condition Management Program started in 1993. The review is conducted by Vanasse Hangen Brustlin, Inc. (VHB), surveying 25% of Portsmouth’s total 104.2-mile, City-maintained road network each year. In 2018, VHB performed a detailed inspection of the condition of the pavement on all the City maintained roads and created a database of information which can be viewed, edited and analyzed using VHB’s RoadManager™ software. The data is linked to the City’s Geographic Information System (GIS), so that thematic maps can be created to display any of the information in the database.

An annual report updating the city’s pavement management system is completed as part of this program. City road conditions are evaluated, the road network conditions and budget requirements are analyzed, and road-paving programs are developed. The report provides recommended funding to maintain street conditions at current levels. These are capital costs. They are implemented over a two-year period with an expected life of 20 years. The Public Works operational budget includes maintenance costs with an expected life of 10 years

Project Team

City Staff: Dave Desfosses, Project Manager, (603) 766-1411, djdesfosses@portsmouthnh.gov

Project Map

Project Updates

Middle Street Paving Week of 7-27-26 Jul 27, 2026

Drainage pipe work in the block between Austin and Summer Streets.

  • Traffic will be down to one lane
  • Outbound traffic from Downtown will be detoured down State Street
     
Middle Street Paving Jul 20, 2026

Middle Street

Milling on Middle Street has begun. Additional cleanup milling will occur on Monday, July 20. Road curbing will start on Wednesday, July 22.

Middle Street Paving and Lincoln Avenue Area Resurfacing Jul 13, 2026

Middle Street

Milling on Middle Street is expected to start Thursday, July 16 and continue into Friday, July 17. 

Additional cleanup milling will occur on Monday, July 20.

Lincoln Street Area Micro-sealing

Resurfacing work started - A parking ban will be in effect for the micro-surfacing treatment, starting at 7 am on Monday, July 13 and Tuesday, July 14 for:  

  • Lincoln Avenue
  • Parrott Avenue
  • Richards Avenue
  • Rockland Street
  • Sherburne Avenue 
  • Elwyn Avenue
  • McNabb Court
Middle Street Paving and Lincoln Avenue Area Resurfacing Jul 6, 2026

Middle Street

Pavement milling is anticipated to begin on Middle Street on Monday, July 13 and will take several days to complete. Paving is expected to begin the week of July 20.

Middle Street will be reduced to a single lane with alternating traffic. Flaggers will be on site to direct vehicles through the work area, expect delays.  

Lincoln Street Area Microsealing

Resurfacing work rescheduled-  Weather permitting, a parking ban will be in effect for the micro-surfacing treatment, starting at 7 am on Monday, July 13 and Tuesday, July 14 for:  

  • Lincoln Avenue
  • Parrott Avenue
  • Richards Avenue
  • Rockland Street
  • Sherburne Avenue 
  • Elwyn Avenue
  • McNabb Court
Congress & State Street Paving June 8 - 10 Jun 1, 2026

Paving anticipated for June 8-10. 

  • State Street from Middle Street to Memorial Bridge
  • Pleasant Street from Porter Street to State Street
  • Daniel Street from Memorial Bridge to Chapel Street
Pavement milling on sections of State Street, Pleasant Street and Daniel Street May 25, 2026

Prep work, including the tip-down accessibility ramps, anticipated for the week of May 25. State Street, Pleasant Street, Daniel Street — Pavement milling on Thurs May 28 and Fri May 29. The DPW crew hopes to do the work in the vicinity of Memorial Bridge starting early — 5:30 am. The following areas will be affected by parking bans:

  • State Street from Middle Street to Memorial Bridge
  • Pleasant Street from Porter Street to State Street
  • Daniel Street from Memorial Bridge to Chapel Street

These streets are then scheduled to be paved the week of June 1.

Resurfacing May 25, 2026

[This project has been rescheduled to July] 

Resurfacing -  Weather permitting prep work including patching, as needed, will take place on Thurs May 28 and Fri May 29 on the streets listed below. Crack sealing is scheduled for Wed June 3, which may affect on-street parking. Then a parking ban will be in effect for the micro-surfacing treatment, starting at 7 am on Thurs June 11 and Friday June 12:  

  • Lincoln Avenue
  • Richards Avenue
  • Parrott Avenue
  • Rockland Street
  • Sherburne Avenue 
  • Elwyn Avenue
  • McNabb Court
Downtown Sidewalk Work May 24, 2026

Downtown Sidewalk Repair is continuing. Crews are working on the tip-down ramps that facilitate access in Market Square and on State and Pleasant Streets. Pedestrians are being redirected to the next crosswalk.

2025 Roads Apr 1, 2025

Crack sealing and micro-surfacing in the South End paving, August 13 & 14, 2025:

  • Robin Lane
  • Pleasant Point Drive
  • Driftwood Lane
  • Boylan Place
  • Moebus Terrace
  • Ball Street
  • Fernald Court
  • Ridges Court
  • Humphrey’s Court
  • South School Street
  • Hancock Street
  • Gates Street

August 11-15, 2025:

  • Deer St from Russell to Market
  • Deer St from Bridge to Maplewood
  • Portsmouth Indoor Pool Walkway
  • Gosling Road Pump Station
  • Peirce Island Road and Pool Parking Area
  • Church St
  • Kane and Alder Streets
  • Pinehurst and Lookout Lane
Paving Projects Completed Apr 1, 2025
  • Top Banfield Road
  • Top Little Harbor Road
  • Dearborn Street final paving
  • Upper Court Street from Middle to Pleasant Streets
  • Pannaway Manor
  • Maplehaven Speed Tables
  • Mirona Road
  • Binder on Boyd Road
  • Elwyn Park phase 2 (Coolidge, Taft, Grant, Taft, Garfield from Hoover to McKinley and Nixon Park)
  • Top Bridge Street Parking Lot
  • Worth Parking Lot overlay
  • Middle Street & Middle Road intersection
  • Market Street from Bow Street to Market Square
  • Pease Tradeport: Corporate Drive
  • Middle Road from Urban compact to Peverly Hill Road
  • Dodge, Harvard, Princeton and Greenland Road Neighborhood
  • Greenland Road
  • South Street from Middle Road to Haven
  • Newcastle Avenue, Marcy Street area from South Street, east
  • Banfield Road
  • Dennett Street
  • International Drive
  • Corporate Drive
  • Bridge Street Parking Lot
  • Lang Road
  • New Hampshire Avenue (from International Drive to Pease Boulevard)
  • Maplewood Avenue (from Dennett to the railroad tracks)
  • Kearsarge Way and various spots in Atlantic Heights
  • Gosling Road
  • South Street
  • Greenland Road
  • Bow Street
  • Corporate Drive
  • International Drive

Project Documents

This section includes the City of Portsmouth’s Pavement Management 2020 Update, which documents roadway condition assessments, analyzes maintenance needs, and evaluates funding scenarios to support planning for street maintenance and paving programs.

Project FAQ

What is the City’s Pavement Management Program?

The Pavement Management Program is the City’s system for evaluating road conditions and planning roadway maintenance and paving projects. As part of the program, the City analyzes roadway conditions, evaluates budget requirements, and develops paving programs to maintain street conditions over time.

How does the City evaluate road conditions?

The City uses a pavement management system that includes inspections of road conditions and a database of roadway information. In 2018, a detailed inspection of all City-maintained roads was completed and entered into pavement management software that can be analyzed and mapped through the City’s Geographic Information System (GIS).

The City uses a pavement management system that includes inspections of road conditions and a database of roadway information. In 2018, a detailed inspection of all City-maintained roads was completed and entered into pavement management software that can

The pavement management system is updated through an annual report that reviews road conditions, analyzes the roadway network, and recommends paving and maintenance work for future years.

What types of roadway work are included in the program?

The program helps plan different types of roadway maintenance and paving work, including resurfacing and preventive maintenance activities such as crack sealing, which helps keep water out of the pavement and extend the life of road surfaces.

Why does the City use a pavement management system?

The pavement management system helps the City prioritize roadway maintenance and determine the funding needed to maintain street conditions. It allows staff to evaluate road conditions across the network and plan projects that preserve streets that are in good condition while addressing roads that need repair.