Monday – Friday 7:30 AM - 3:30 PM
Vaughan Mall Project Pre-Construction Public Information Meeting
6:00 PMCity Hall Conference Room A
DPW Construction Projects
Construction Project Pages
Each project has its own subscription list for those who want to be kept informed about the different City projects.
Hanover Garage: visit the project page
Islington Street: visit the project page.
DPW Hosts Vaughan Mall Project Design Public Meeting on July 7, 2025
Vaughan Mall Project
What to do if you have Discolored Water
Discolored water results when water traveling through the water mains reaches high enough velocities to stir the sediment lying in the bottom of the water mains. Water main breaks, fire fighting activities, and extremely high system demand are typical causes of discolored water. There are no health risks associated with this type of problem, as the particulate matter causing the discoloration is not harmful.
Point of Graves Wall Replacement Project

The retaining wall at the corner of Peirce Island Road and Mechanic Street for the Point of Graves Burying Ground, the city's oldest cemetery, was damaged by a vehicle collision and needs repair.