Archived Bids and Proposals
2017 - 2016 - 2015 - 2014 - 2013 - 2012 - 2011 - 2010 - 2009 - 2008 - 2007 - 2006 - 2005
Bid Contact phone number (603) 610-7227
Attention Bidders
If you have difficulty downloading any bid or proposal, or if you have questions, please contact the Purchasing Coordinator at (603) 610-7227. The City may elect not to post all City bids and requests for proposal on this web site. If you are looking for a particular bid or proposal document and do not see it here please contact the Purchasing Coordinator at the number above.
It is your responsibility to download completely documents from this web site and to check this web site for any additional documentation that may be issued relative to a particular document. Addenda will be identified on the web site, including date of issuance. The City will post addenda on this site at least 2 business days prior to the deadline for bid/proposal submittal. The City will not inform you of addenda. The City reserves the right to postpone the bid opening. Please review any additional instructions.
You should not alter or modify any bid documents or proposal forms downloaded from this web site. Altering or modifying such documents or forms may result in disqualification.
| 2012 | ||||||
|---|---|---|---|---|---|---|
| Bid/Proposal | Deadline | Additional Instructions | Pre-bid Meeting | Addenda | Bid Summary / Award | |
| RFQ 15-13 Engineering Services Pease Wastewater Treatment Facility Evaluation [PDF] | December 13, 2012 | Pre-Proposal Meeting is November 20,2012. | Addendum #1 [PDF] | |||
| RFP 17-13 Engineering & Design Services Streetscape Improvements - Ranger Way Atlantic Heights [PDF] | December 4, 2012 | Mandatory pre-proposal meeting is November 27, 2012 | ||||
| RFP 19-13 Wayfind Program [PDF] | November 29, 2012 | Optional pre-proposal meeting is November 14, 2012 | Addendum #1 [PDF] | |||
| Bid 10-13 Type III Ambulance [PDF] | November 5, 2012 | |||||
| RFP 13-13 Annual Elevator Maintenance [PDF] | November 1, 2012 | |||||
| RFQ 18-13 Professional Planning Services for Form-Based Code for Downtown [PDF] | October 25, 2012 | 
 
 | ||||
| Bid 12-13 Water Inventory [PDF] | October 22, 2012 | Various | ||||
| Bid 11-13 Sewer Inventory [PDF] | October 22, 2012 | Various | ||||
| Bid 08-13 Sale of Surplus Vehicles/Equipment [PDF] | September 12, 2012 | Various | ||||
| RFQ #03-13, Water and Wastewater System Rate Study [PDF] | August 30, 2012 | Municipal & Financial Services Group | ||||
| Bid 04-13 Six Month Chemical Bid [PDF] | August 29, 2012 | Various | ||||
| Bid 07-13 Coakley Rd. & Cottage St. Sidewalk Connection [PDF] 07-13 Drawings | August 29, 2012 | All requests for mailed documents must be accompanied by an additional fee of $10.00 to cover the cost of postage and handling. Copies of the plans and specs may be picked up  at the Purchasing Department, 3rd floor, City Hall. | Bourassa Const., LLC | |||
| Bid 06-13 Fire Station 2 Apparatus Floor [PDF] | August 27, 2012 | Northeast Safe-T- Solutions, Inc. | ||||
| Bid 05-13 Marcy Street Roadway and Sidewalk Construction [PDF] 
 | August 27, 2012 | The bid due date is 
 Hard copies of the plans and specs  may be picked up Thursday August 2, 2012 or later,  at the Purchasing Department, 3rd floor, City Hall. 
 | August 10, 2012 | Addendum #1 [PDF] | Santorelli Construction | |
| Bid 34-12 Market St. Roadway Improvements [PDF] | August 13, 2012 | Plans are available for this project. by clicking here (4 mb) [PDF] or can be picked up at the Purchasing Department, 3rd floor, City Hall. | Addendum #1 [PDF] | Pike Industries | ||
| Bid: The Portsmouth School Department is accepting quotes for printing needs for the 2012/13 school year [PDF] | July 20, 2012 | Main Contact: Amy Noble (603) 431 5080 | ||||
| Re-Bid 38-12 Portsmouth Middle School Technology Equipment Contact [PDF] Contact is Steve Bartlett, Portsmouth School Department | July 11, 2012 2 P.M. | Deadline for questions is July 5, 2012. 
 | ||||
| Bid #40-12 Maynard Park Fence Replacement Atlantic Heights [PDF] | July 9, 2012 | Four Seasons Fence | ||||
| 
 
 
 | July 2, 2012 | 
 
 | Glacial Energy | |||
| 
 
 
 | June 28, 2012 | 
 
 | ADT/Tyco | |||
| 
 
 
 | June 28, 2012 | 
 
 | A mandatory pre-bid meeting will be held Friday, June 15, 2012 | Santorelli Construction | ||
| 
 
 
 | June 27, 2012 | 
 
 | Hanscom's Truck/Dennis K. Burke | |||
| 
 
 
 | June 26, 2012 | 
 
 | ||||
| 
 
 
 | June 26, 2012 | 
 
 | Bourassa Const., LLC | |||
| 
 
 
 | June 8, 2012 | 
 
 | Bourassa Const., LLC | |||
| Bid 29-12 I95 & Market Street Traffic Signage [PDF] | May 30, 2012 | Roadsafe Traffic | ||||
| RFP 30-12 High Hanover Garage Security Guard [PDF] | May 24, 2012 | |||||
| Bid Cass Street Area Sewer Improvements [PDF] | May 10, 2012 | This bid is only open to pre-qualified contractors | Albanese D&S | |||
| Bid 31-12 Coastal Resilience Initiative [PDF] | April 30, 2012 | Addendum #1 [PDF] | Rockingham Planning Commission | |||
| Bid 23-12 Boilers and Cooling Towers Equipment Treatment Programs [PDF] | April 20, 2012 | Cascade Water | ||||
| Bid 28-12 Portsmouth City Hall Boiler Plant Building Improvements [PDF] | April 9, 2012 | Pre-bid meeting attendees [PDF] | March 27, 2012 | 
 | Ricci Construction | |
| Bid 27-12 Mobile Vending From Municipal Spaces [PDF] | March 30, 2012 | No Bids Received | ||||
| Lincoln Ave. Contract 3B Pre-qualification [PDF] | March 22, 2012 | This bid is only open to pre-qualified contractors | Addendum #1 [PDF] | |||
| Portsmouth School Department ORGANIC ATHLETIC FIELD APPLICATION(s) AND SYNTHETIC TURF MAINTENANCE. [PDF] | March 21, 2012 | Main Contact: Ken Linchey (603) 431 5080 ext. 251 | ||||
| Bid 21-12 Six Month Chemical Bid [PDF] | February 14, 2012 | Various | ||||
| Lincoln Ave. Contract 3B Pre-qualification [PDF] | January 26, 2012 | Albanese Brothers, Inc. | ||||
| RFQ 19-12 Construction Management Services for Renovation of Portsmouth Municipal Complex [PDF] | January 26, 2012 | Attendees - Preproposal meeting [PDF] 
 | January 19, 2012 | Ricci Const. | ||
| BID 18-12 Sale of Police Department's Uninterrupted Power Supply Surplus Equipment [PDF] | January 18, 2012 | No Bids Received | ||||
| RFP 17-12 Multi Function Device (Copy Machine) [PDF] | January 10, 2012 | Addendum #1 [PDF] Addendum #2 [PDF] Addendum #3 [PDF] | Ikon Office Products | |||
| 2008 | ||||||
|---|---|---|---|---|---|---|
| Bid/Proposal | Deadline | Additional Instructions | Pre-bid Meeting | Addenda | Bid Summary / Award | |
| Bid 31-09 Bike Racks for Little Harbour, St. Patrick and the Middle School [PDF] | December 9, 2008 | Dero Bike | ||||
| Bid 24-09 School Crossing Crosswalk Safety Signs [PDF] | December 8, 2008 at 2:30 p.m. | Hi-Way Safety | ||||
| RFP 20-09 Snow Removal Services [PDF] | November 13, 2008 at 2:00 P.M. | JAMCO & Renaud Trucking | ||||
| Bid 15-09 REQUEST FOR PROPOSALS COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING & DESIGN SERVICES TWO CITY PARKS: PLAINS AND PINE STREET PLAYGROUNDS [PDF] | October 30, 2008 at 2:00 P.M. | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | Pre-bid October 16, 2008 | Addendum #1 [PDF] | Weston & Sampson | |
| Bid 22-09 Sale of Surplus Vehicles [PDF] | October 29, 2008 at 2:30 p.m. | Various bidders | ||||
| Bid 18-09 POLICE DEPARTMENT UNMARKED FORD FUSION [PDF] | October 24, 2008 at 2:30 p.m. | bids rejected | ||||
| Bid 19-09 POLICE DEPARTMENT ANIMAL CONTROL - FORD RANGER - [PDF] | October 24, 2008 at 2:45 p.m. | bids rejected | ||||
| Bid 09-09 High/Hanover Parking Facility Maintenance project. [PDF] | October 22, 2008 at 2:30 p.m. | Addendum #1 | Hascall & Hall | |||
| RFP 21-09 Parking Garage Access Control equipment upgrade. [PDF] | October 17, 2008 | Amano McGann, Inc. | ||||
| Bid: Snow removal for the Portsmouth schools for the 2008/09 school year [PDF] | October 17, 2008 | Main Contact: Steve Bartlett (603) 431 5080 | ||||
| Bid 07-09 Gates Street Reconstruction Project [PDF] | October 10, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | Pre-bid meeting is October 3, 2008 @ 10:00 a.m. | Addendum #3 | Gove Constr | |
| Bid 13-09 HISTORIC BRIDGE AND ABUTMENT REMOVAL PROJECT [PDF] | September 22, 2008 | No bids received | ||||
| Bid 12-09 Hooklift and Plow System [PDF] | September 18, 2008 | HP Fairfield | ||||
| RFQ 10-09 Demolition of former Portsmouth Gun Club. [PDF] | September 18, 2008 | Gun Club address: 305 Greenland Road, Portsmouth, NH. Questions may be addressed to Dave Allen at 703-766-1421. | Clarification Questions & Answers [PDF] | Danley Demolition | ||
| RFP 11-09 “Household Hazardous Waste Collection Services" [PDF] (4.1MB) | September 15, 2008 | Clean Harbors | ||||
| Rye Line Wastewater Pumping Station [PDF] | August 28, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | Mandatory Pre-bid meeting August 14, 2008 at 10:00 a.m. | Addendum #1 [PDF] | ||
| Bid #06-09 Route 33 Bridge Construction [PDF] | August 12, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | July 22, 2008 at 10:00 a.m. | Addendum #1 [PDF] Addendum #2 [PDF] | R.S. Audley | |
| Bid #05-09 Electrical Services Contract [PDF] | August 8, 2008 | Kohlhase Electric | ||||
| Bid #02-09 Woodbury Avenue Traffic Improvements [PDF] | August 6, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 | Addendum #1 [PDF] | John Lyman & Sons | ||
| Bid #03-09 Electric Truck [PDF] | July 30, 2008 | Hilltop Chevrolet | ||||
| RFP #04-09 SCRAP METAL PURCHASE & RECYCLING SERVICES [PDF] | July 25, 2008 | East Coast Electronics Recycling | ||||
| Bid #60-08 Hooklift and Plow System [PDF] | July 11, 2008 | Addendum #1 [PDF] | All bids rejected, re-bid as #12-09 | |||
| Bid #55-08 Plumbing & Heating Repair Services [PDF] | July 18, 2008 | Pre-bid meeting is July 08, 2008 at 9:00 a.m. | Hart Plumbing & Heating, Inc. | |||
| Bid #57-08 Boilers and Cooling Towers Equipment Treatment Program [PDF] | July 3, 2008 | Cascade Water Services Inc | ||||
| Bid #51-08 Portsmouth Fire Station 1 (Central Station) Modifications Replacement of 6 Overhead Doors, Widening Four Apparatus Entries, Historic Brickwork & Misc. Structural Improvements 170 Court Street, Portsmouth, NH [PDF] | July 31, 2008 | This bid is only open to pre-qualified contractors. | Pre-bid meeting is July 24, 2008 at 10:00 a.m. | Addendum #1 [PDF] Addendum #2 [PDF] | ||
| Bid: The Portsmouth School Department is accepting quotes for printing needs for the 2008/09 school year [PDF] | June 27, 2008 | Main Contact: Steve Bartlett (603) 431 5080 ext 223 | ||||
| Bid #01-09 Annual Fuel [PDF] | June 23, 2008 | Dennis K. Burke and Hometown Oil | ||||
| Bid #56-08 Pavement Markings [PDF] | May 28, 2008 | |||||
| Bid #49-08 2008 Annual Paving Project [PDF] | May 23, 2008 | |||||
| RFP # 43-08 ENGINEERING SERVICES CSO - LONG TERM CONTROL PLAN PROJECTS State Street Utilities and Road Upgrade [PDF] | May 22, 2008 | Mandatory Pre-Proposal Meeting is: May 6, 2008 @ 10:00 a.m. | CMA Engineering | |||
| Bid #53-08 Public Works - Sewer Division Truck #65 Combination Sewer Cleaner [PDF] | April 28, 2008 | C.N. Wood | ||||
| Bid #30-08 “Six-inch Portable Trash Pump†[PDF] | April 7, 2008 | Godwin Pumps | ||||
| Bid # 48-08 Maintenance Garage Infrared Heaters [PDF] | April 9, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. 
 | Tuesday, March 25, 2008 at 10:30 a.m. Bidders will meet in front of the Portsmouth Public Works lobby, 680 Peverly Hill Road. | Addendum #1 [PDF] | Weston & Sampson Engineers | |
| Bid #47-08, Market Street Downtown Sidewalk Project [PDF] | April 4, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. 
 | There will be a mandatory on-site pre-bid meeting on March 28, 2008 at 10:00 AM. Bidders and the City will meet on site. | Santorelli Const. | ||
| Bid #50-08 Surplus Vehicles [PDF] | April 2, 2008 | Interested bidders may view the Public Works vehicles/equipment between the hours of 10:00 a.m., and 2:00 p.m., on March 25, 2008 at the Public Works Facility. | Various | |||
| RFP# 46-08 Testing, Special Inspections, and Subsurface Explorations. [PDF] | March 28, 2008 | Addendum #1 [PDF] | ||||
| Bid #40-08 Raleigh Way Streetscape Improvements Phase 1 [PDF] | March 26, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | mandatory pre-bid meeting on March 13th, 2008 at 10:00 a.m. | Addendum #1 [PDF] | John Lyman & Sons | |
| Bid #18-08 Little Harbor Replacement Windows [PDF] | March 17, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | Mandatory Pre-bid meeting is: March 3,2008 @ 3:30 p.m. | Addendum #1 [PDF] | NH Glass | |
| RFP #44-08 Enterprise Asset Management Software and Services. [PDF] | March 14, 2008 | All questions by as to the interpretations of the RFP must be submitted in writing to: Lori MacGinnis, Purchasing Coordinator, 1 Junkins Avenue, Portsmouth, NH 03801, by March 6, 2008. | Addendum #1 [PDF] Addendum #2 [PDF] | VueWorks | ||
| Bid #45-08 Public Works Department Downtown Street Lights [PDF] | March 11, 2008 | Addendum #1 [PDF] | Rexel | |||
| Bid #41-08 Maintenance Garage Roof Replacement [PDF] | February 25, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | Mandatory Pre-bid meeting is: Feb. 14, 2007 @ 12:00 p.m. | Addendum #1 [PDF] Addendum #2 [PDF] Addendum #3 [PDF] | Progressive Roofing | |
| Bid #13-08 Roof Replacement Projects [PDF] | February 25, 2008 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | Mandatory Pre-bid meeting is: Feb. 14, 2008 at 12:30 p.m. | Addendum #1 [PDF] Addendum #2 [PDF] Addendum #3 [PDF] | Progressive Roofing | |
| RFP #42-08 Cama System Conversion [PDF] | February 15, 2008 | No | No | No | Vision Appraisal | |
| Bid #38-08 Annual Chemicals [PDF] | February 1, 2008 | No | No | No | Various | |
| Bid #33-08 Water Inventory [PDF] | January 25, 2008 | No | No | No | Various | |
| Bid #32-08 Sewer Inventory [PDF] | January 25, 2008 | No | No | No | Various | |
| RFP #39-08 PREQUALIFICATION STATEMENTS for the construction of: Bartlett Areas Sewer Improvements [PDF] | January 25, 2008 | No | No | No | ||
| Bid #35-08 Wastewater Treatment Plant Truck S-14 [PDF] | January 7, 2008 | No | No | No | Hilltop Chevrolet | |
| Bid #36-08 Wastewater Treatment Plant Truck S-41 [PDF] | January 7, 2008 | No | No | No | 3Hilltop Chevrolet | |
| RFP #34-08 Fundamental Building Systems Commissioning Fire Station II [PDF] | January 4, 2008 | Pre-Proposal meeting canceled see ADD#1 | Pre-Proposal meeting is Dec. 20, 2007 at 11:00 a.m. | Addendum #1 [PDF] | Cornerstone Commissioning | |
| 2007 | ||||||
|---|---|---|---|---|---|---|
| Bid/Proposal | Deadline | Additional Instructions | Pre-bid Meeting | Addenda | Bid Summary / Award | |
| RFP#08-08 - MIDDLE SCHOOL DESIGN ALTERNATIVES PROFESSIONAL SERVICES [PDF] | December 7, 2007 | This RFP is open only to firms pre-qualified through RFQ 08-08 below | November 19, 2007 | Addendum #1 [PDF] | JCJ Architects | |
| RFQ#08-08 A/E Development of Design Alternatives for the Portsmouth Middle School [PDF] | September 27, 2007 | No | No | Addendum #1 [PDF] | List of Firms [PDF] | |
| Bid #37-08 POLICE DEPARTMENT VEHICLES [PDF] | December 18, 2007 | No | No | No | Portsmouth Ford Used Car Center | |
| Mechanic Street Pumping [PDF] | December 20, 2007 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | December 10, 2007 @ 9:00 a.m. | Addendum #1 [PDF] | Keymont Construction | |
| RFP #28-08 Scum & Grease Removal [PDF] | December 12, 2007 | No | No | No | Stewart's Septic Service | |
| RFP #27-08 Snow Removal Services [PDF] | December 3, 2007 | No | No | No | Various | |
| BID #15-08 Market St. Sidewalk Project [PDF] | November 27, 2007 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | Addendum #1 [PDF] Addendum #2 [PDF] Addendum #3 [PDF] | |||
| BID #17-08 Police Department Dehumidification System [PDF] | November 20, 2007 | Please contact Lori MacGinnis to pre-register to attend pre-proposal meeting: (603) 610-7227. | Mandatory pre-bid meeting is November 15, 2007 at 10:00 a.m. | Addendum #1 [PDF] | Granite State Plumbing & Heating | |
| RFP #19-08 Madbury Water Treatment Plant Upgrade - Value Engineering Review [PDF] | November 20, 2007 | No | No | No | Metcalf & Eddy | |
| BID #22-08 School Department Tractor [PDF] | November 19, 2007 | No | No | Addendum #1 [PDF] | Shaw’s Ridge Equipment | |
| RFP #21-08 Engineering Services CSO-Long Term Control Plan Projects [PDF] | November 14, 2007 | No | Pre-proposal meeting is October 30, 2007 at 10:00 a.m. | No | Underwood Engineering | |
| RFP #20-08 Engineering & Design Services Sagamore Ave South Sewer Extension [PDF] | November 14, 2007 | No | Pre-proposal Meeting is October 30, 2007 at 9:00 a.m. | No | Wright-Pierce | |
| Bid #25-08 Police Dept. Ammunition [PDF] | October 22, 2007 | No | No | No | Eagle Point Gun | |
| Bid #23-08 Police Dept. Vehicles [PDF] | October 19, 2007 | No | No | No | BIDS REJECTED | |
| Bid #24-08 Police Cruiser Laptops [PDF] | October 18, 2007 | No | No | No | TransCorp | |
| Bid #36-07 High Hanover Parking Facility Stairtower Roof Project [PDF] | See Addendum #4 | Questions may be directed to Lori MacGinnis at (603) 610-7227. | No | Addendum #1 [PDF] Addendum #2 [PDF] Addendum #3 [PDF] Addendum #4 [PDF] Addendum #5 [PDF] | Ricci Construction | |
| RFQ #12-08 CALL FOR ARTISTS AFRICAN BURIAL GROUND [PDF] | October 4, 2007 at 1:30 p.m | No | No | Addendum #1 [PDF] | ||
| RFP #14-08 Design Market St. Extension Gateway Streetscape Improvements [PDF] | October 4, 2007 | No | No | Addendum #1 [PDF] | The Cecil Group | |
| RFQ #16-08 Construction Management Services Fire Station II [PDF] | October 3,2007 at 4:00 p.m. | No | No | Addendum #1 [PDF] | Baybutt Construction Managers | |
| RFP #07-08 Water Meter Replacement & Automated Meter Reading Deployment. [PDF] | September 7, 2007 | No | August 17, 2007 at 10:00 a.m. | Addendum #1 [PDF] | Datamatic Ltd. | |
| RFP #09-08 Parking Garage Access and Revenue Control Program Upgrade [PDF] | August 31,2007 | No | McGann Associates | |||
| RFP #06-08 Middle St. Sidewalk Project & Union St. Curbing. [PDF] | August 28, 2007 | No | No | Gove Construction | ||
| RFP #11-08 Household Hazardous Waste Collection [PDF] | August 24, 2007 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | Care Environmental | |||
| Bid #05-08 High/Hanover Parking Facility Maintenance Project [PDF] | August 23, 2007 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. | G.S. Bolton | |||
| RFP #04-08 Instrumentation & Scada Services [PDF] | August 23,2007 | No | August 8, 2007 at 9:00 a.m | Electrical Installations | ||
| Bid #03-08 New Castle Ave./Marcy St. Sidewalk [PDF] | August 15, 2007 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package | No | R.H. White | ||
| Bid #02-08 Heavy Duty Street Sweeper [PDF] | July 30, 2007 | No | No | Casey & Dupuis | ||
| Bid #51-07 Sewer Division Truck with Sewer Cleaner [PDF] | July 25, 2007 | No | No | No award | ||
| Bid #41-07 Dump Truck with Plow and Patrol Wing. [PDF] | July 3, 2007 | No | No | Freightliner of New Hampshire | ||
| RFP #49-07 Engineering Inspection and Evaluation of Portsmouth Seawalls [PDF] | June 27, 2007 | Seawall Maps [PDF] | No | Water Front Engineers | ||
| Bid #01-08 Annual Fuel Bid [PDF] | June 25, 2007 | No | No | Addendum #1 [PDF] | Hometown Oil, Hanscom's Truck Stop, Dennis K. Burke and Global Montello Group | |
| Bid #50-07 Police Cruisers [PDF] | June 22,2007 | No | No | Addendum #1 [PDF] | Herb Chambers | |
| Bid #48-07 Bicycle Route Improvement Projects [PDF] | June 15, 2007 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package | No | Addendum #1 [PDF] | Markings Inc. | |
| RFP #43-07 Annual Services Contract - Generator Systems [PDF] | June 13, 2007 | No | No | Addendum #1 [PDF] Addendum #2 [PDF] | Power Up Generator | |
| RFP # 08-07 Canoe/Kayak Dock Project Design Build. [PDF] | June 13, 2007 | No | May 31, 2007 at 1:00 p.m. | Addendum #1 [PDF] Addendum #2 [PDF] | Pickering Marine | |
| RFP #21-07 Action Plan for Islington Street Corridor and Arts District Plan [PDF] | June 11, 2007 | No | No | Richardson & Associates | ||
| RFP #45-07 Parking Enforcement and Violations Management Program [PDF] | May 15, 2007 | No | No | CLARIFICATION QUESTIONS AND ANSWER | T2 Systems | |
| Bid #42-07 Pavement Markings [PDF] | May 4, 2007 | No | No | No | Markings Inc. | |
| RFP #37-07 Fire Station Statue [PDF] | May 2, 2007 | No | No | No | Emile Birch | |
| RFP #39-07 MECHANIC STREET PUMPING STATION ELECTRICAL UPGRADE [PDF] | May 1, 2007 | Mandatory pre-proposal meeting on April 17, 2007 at 10:00 a.m. | No | Wright- Pierce | ||
| Bid #40-07 2WD ½ Ton Pick Up Truck [PDF] | April 30, 2007 | No | No | No | Ron Currier's Chevrolet | |
| Bid #19-07 Highway Loader [PDF] | April 23, 2007 | No | No | No | Chadwick-BaRoss Inc. | |
| BID #35-07 Annual Paving [PDF] | April 12, 2007 | No | No | No | Pike Industries | |
| RFP #38-07 Library Sale of Surplus Book Shelving [PDF] | March 27, 2007 | No | March 21, 2007 at 10:00am | No | No bids received | |
| RFP #32-07 Congress Street Sidewalk Project [PDF] | March 26, 2007 | No | March 13, 2007 at 11:00am | Addendum #1 [PDF] | R.H. White Construction | |
| RFP #30-07 Ground Lease and Redevelopment of the Old Public Library [PDF] | May 16, 2007 | No | March 14, 2007 at 1:30pm | No | Portsmouth Historical Society | |
| RFP #34-07 Annual Chemicals for Swimming Pools [PDF] | March 16, 2007, 2007 | No | No | No | Fillion Associates | |
| Bid #28-07 Sale of Surplus Vehicles [PDF] | February 28, 2007 | No | No | No | Various | |
| Bid #31-07 Downtown Street Lights [PDF] | February 22, 2007 | No | No | Addendum #1 [PDF] | Rexel/CLS | |
| RFP # 25-07 Wastewater Facilities Plan Update and Combined Sewer Overflow [PDF] | February 23, 2007 . | No | Pre-proposal meeting is Feb. 6, 2007 @ 10:00 a.m. | No | ||
| BID # 24-07 Water Inventory [PDF] | January 26, 2007 | No | No | No | Various | |
| BID # 20-07 Annual Chemicals [PDF] | January 25, 2007 | No | No | Addendum #1 [PDF] | Various | |
| RFP #26-07 Police Dept. Indoor Firing Range Wall & Baffle Upgrade [PDF] | January 5, 2007 | Please contact Karen Senecal to attend pre-proposal meeting at (603) 610-7400 | Mandatory prebid meeting: December 21, 2006 at 9:00am | No | Deschenes Acoustics | |
| Borthwick Avenue Sewer Upgrade [PDF] | January 12, 2007 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package | Mandatory prebid meeting: December 20, 2006 at 9.00am | Addendum #1 [PDF] | D&C Construction | |
| 2006 | ||||||
|---|---|---|---|---|---|---|
| Bid/Proposal | Deadline | Additional Instructions | Pre-bid Meeting | Addenda | Bid Summary / Award | |
| RFP # 23-07 Sewer Inventory [PDF] | December 15, 2006 | No | No | No | Various | |
| RFP # 18-07 African Burial Ground Design and Engineer Services [PDF] | December 14, 2006 | No | pre-proposal meeting: November 30, 2006 at 10:00am. | Addendum #1 [PDF] | Various | |
| RFP # 22-07 Library Interior Signage [PDF] | December 4, 2006 | No | No | No | Advantage Signs | |
| RFP # 16-07 Snow Removal Services [PDF] | November 1, 2006 | No | No | No | Various | |
| RFP # 17-07 Police Van [PDF] | October 26, 2006 | No | No | No | Grappone Ford | |
| RFP # 13-07 Type III Ambulance [PDF] | October 24, 2006 | No | No | No | Specialty Vehicles | |
| RFP # 12-07 Demolition of Islington St. Water Tank [PDF] | October 23,2006 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package | No | Addendum #1, please contact Lori MacGinnis at (603) 610-7227 | Rexel/CLS | |
| RFP # 07-07 Engineering & Design Services Raleigh Way Streetscape [PDF] | September 28, 2006 | No | Pre-bid meeting on September 18, 2006 at 2:00pm | No | CLD Engineers | |
| Bid # 05-07A Re-bid of Shelving [PDF] | September 6, 2006 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package | No | No | Donnegan Systems, Inc. | |
| RFP #10-07 Market Street - Bicycle & Pededstrian Path [PDF] | August 31,2006 | No | No | No | Gorrill Palmer | |
| RFP #09-07 - Engineering Services I-95 Exit 7 (Market St.) Interchange Improvements [PDF] | August 31, 2006 | No | No | No | Gorrill Palmer | |
| Fund Management Services [PDF] | August 31, 2006 at 4:00pm | No | No | No | ||
| Bid -Pleasant Point Sewer Extension [PDF] | August 22, 2006 | To Obtain Plans & Specs, Please call Lori MacGinnis at (603)-610-7227 | August 15, 2006 at 10:00am | Addendum #1 [PDF] | North Hampton Excavating | |
| Bid #06-07 - Elevator Service Maintenance [PDF] | August 9, 2006 | No | No | No | Stanley Elevator | |
| Bid #04-07 - Portsmouth Public Library Moving Services [PDF] | August 8, 2006 | Interested vendors must contact Lori MacGinnis at 603-610-7227 for a bid package | July 17, 2006 at 1;00p.m. | No | William B. Meyer | |
| Bid #05-07 - Portsmouth Public Library Shelving [PDF] | July 24, 2006 | Interested vendors must contact Lori MacGinnis at 603-610-7227 for a bid package | No | No | Bid 05-07 not awarded, rebid as 05-07A | |
| Bid #03-07 - Portsmouth Public Library Furnishings [PDF] | July 19, 2006 | Interested vendors must contact Lori MacGinnis at 603-610-7227 for a copy of bid specs. | No | No | Union Office Interiors | |
| Bid #33-06 - Engineering & Design Services Madbury Water Treatment Plant Upgrade [PDF] | July 14, 2006 | No | Mandatory Pre-bid meeting is June 22, 2006 at 10:00am | No | ||
| RFP #01-07 Annual Fuel [PDF] | June 26, 2006 | No | No | No | G Dennis K. Burke and Hometown Oil | |
| RFP #02-07 New Library Access Security [PDF] | June 21, 2006 | Interested vendors must contact Lori MacGinnis at 603-610-7227 for specs & plans. | Mandatory pre-bid meeting is June 14, 2006 at 11:30am. | No | American Alarm | |
| Bid #65-06 - Police Department Mobile Data Computers [PDF] | June 19, 2006 | No | No | Addendum #1 [PDF] | Transcor | |
| Bid #63-06 - Police Department Indoor Training Firing Range UPgrade [PDF] | June 19, 2006 | No | Mandatory Pre-bid meeting is June 9, 2006 at 10:00am | No | ||
| Bid - Lower Court Street Reconstruction [PDF] | June 16, 2006 | Prequalifications due May 24, 2006. Contact Lori MacGinnis 603-610-7227 for more information. | Mandatory Prebid June 6, 2006 9:00am | Addendum #1 [PDF] | Gove Construction | |
| Bid #64-06- Police Department Recording System [PDF] | June 15, 2006 | No | No | Addendum #1 [PDF] Addendum #2 [PDF] Addendum #3 [PDF] Addendum #4 [PDF] | Exacom | |
| Bid #50-06 - South & Miller Intersection Signal Improvements [PDF] | June 15, 2006 | Interested vendors must contact Lori MacGinnis at 603-610-7227. | No | Addendum #1 [PDF] Addendum #2 [PDF] | New England Signals | |
| Bid #48-06 - DOWNTOWN INTERMODAL TRANSPORTATION CENTER AND SIDEWALK IMPROVEMENT PROJECT HANOVER AND HIGH STREET [PDF] | June 12, 2006 | Interested vendors must contact Lori MacGinnis at 603-610-7227. | Mandatory Prebid meeting is June 5, 2006 at 10:30am | Addendum #1 [PDF] | Santorelli Construction | |
| Bid #29-06 - Crescent Way Improvement Project, Atlantic Heights Streetscape [PDF] | June 9, 2006 | Interested vendors must contact Lori MacGinnis at 603-610-7227. | Mandatory Prebid meeting is June 2, 2006 at 10:00am | No | Gove Construction | |
| Bid #53-06 - High Hanover Garage Security Guard [PDF] | May 19, 2006 | No | No | No | Reliable Security | |
| Bid #55-06 - Middle & Haven Road Sidewalk Improvements [PDF] | May 12, 2006 | Interested vendors must contact Lori MacGinnis at 603-610-7227. | No | No | John Lyman & Sons | |
| Bid #39-06 Residential Water Conservation Kits [PDF] | May 8, 2006 | No | No | No | Niagra Conservation Group | |
| Bid #57-06 New Castle Avenue Roadway [PDF] | April 28, 2006 | No | Mandatory pre-bid meeting is April 13, 2006 at 10:00am | Addendum #1 [PDF] Addendum #2 [PDF] | D & C Construction | |
| Bid #58-06 - Voice and Data Cabling for the Library [PDF] | April 20, 2006 | To obtain plans/drawings for this bid, please Contact Lori MacGinnis, 603-610-7227. | Mandatory Prebid meeting is April 13, 2006 at 10:00am | No | Computer Cable Company | |
| Bid #52-06 - Pavement Markings [PDF] | April 13, 2006 | No | No | No | Markings Inc. | |
| Bid #49-06 - Annual Paving Project [PDF] | April 12, 2006 | No | No | Addendum #1 [PDF] | Pike Industries | |
| Bid #54-06 - Plumbing and Heating Repair Services [PDF] | March 31, 2006, 2006 | No | No | No | Pettigrew | |
| Bid #56-06 - Police Dept. Scott SWAT-PAK SCBA FR Respirators [PDF] | March 28, 2006, 2006 | No | No | No | Fisher Scientific | |
| RFP #51-06 - Storm Water Master Plan Project [PDF] | March 17, 2006, 2006 | No | March 3, 2006, 2006 at 1:30pm | No | Edwards & Kelcey | |
| RFP #40-06 - Public Works Plotter/Scanner [PDF] | March 15, 2006, 2006 | No | No | No | Topaz Eng. | |
| RFP #46-06 - Aerial Photography and Related Professional Services [PDF] | March 13, 2006 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 | No | Brad Street | ||
| Bid #03-06 Maple Haven Park Playground Equipment [PDF] | March 8, 2006, 2006 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 | No | Addendum #1 [PDF] | O’Brien | |
| Bid #37-06 Maple Haven Park Site Work [PDF] | March 8, 2006, 2006 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 | No | Addendum #1 [PDF] | Farnese Const. | |
| RFQ #41-06 - Architectural & Engineering services for the Conceptual design and planning of Ports. Department Station [PDF] | March 7, 2006, 2006 | No | No | No | ||
| RFP #38-06 - Revision of Zoning Ordinance, Site Review & Subdivision regulations [PDF] | March 1, 2006, 2006 | No | No | No | Taintor and Assoc. | |
| RFP #36-06 - Marine Unit Fire Fighting Vessel [PDF] | February 17, 2006 | No | No | No | Metalcraft | |
| Bid - Deer Street Pumping Station Improvements [PDF] | February 16, 2006 | No | Mandatory prebid meeting January 19, 2006 at 10:00am | No | Keymont Const. | |
| Bid #35-06 - Sale of Surplus Vehicles [PDF] | February 10, 2006 | No | No | No | Various Awards | |
| Bid #26-06 New Castle Ave. Roadway and Seawall Project [PDF] | February 10, 2006 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 | Mandatory pre-bid meeting is January 30, 2006 at 10:00am | Addendum #1 [PDF] Addendum #2 [PDF] Addendum #3 [PDF] Addendum #4 [PDF] Addendum #5 [PDF] | Rejected - rebid as #57-06 | |
| RFP #32-06 Engineering & Design Services Pleasant Point Area Sewer Extension [PDF] | February 2, 2006, | Mandatory Pre-proposal Meeting January 19, 2006 at 1:30pm | Addendum #1 [PDF] | Dufresne-Henry | ||
| Bid #30-06- Shoreline Repairs Prescott Park and Four Tree Island [PDF] | January 31, 2006 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 | Mandatory pre-bid meeting January 23, 2006 at 2:00pm. | Addendum #1 [PDF] | Jaime Construction | |
| Bid #34-06 Water Inventory [PDF] | January 27, 2006 | No | No | No | Various Vendors | |
| Bid #31-06- Annual Chemicals [PDF] | January 26, 2006 | No | No | Addumium # 1 [PDF] | Various Vendors | |
| LINCOLN AVE. AREA SEWER SEPARATION - CONTRACT #2 [PDF] | Pre- qualification deadline is Jan. 25, 2006 | Interested vendors must contact Lori MacGinnis at (603) 610-7227 | No | No | Park Const. | |
| Bid #28-06 Professional Services City-Wide Overtime Audit [PDF] | January 6, 2006, | No | No | YES [PDF] | Matrix | |
| 2005 | ||||||
|---|---|---|---|---|---|---|
| Bid/Proposal | Deadline | Additional Instructions | Pre-bid Meeting | Addenda | Bid Summary / Award | |
| Bid #27-06 Police Dept. Update Access Control [PDF] | December 30, 2005 | Interested vendors must contact Communications Supervisor Gil Emery at (603) 610- 7411 to confirm attendance at the pre-bid meeting. | Mandatory Pre-bid meeting is December 19, 2005 2:00pm. | Addumium # 1  [PDF] Addumium # 2 [PDF] Addumium # 3 [PDF] | Diebold | |
| Bid #25-06 Sewer Inventory [PDF] | December 16, 2005 | No | No | No | John Hoadley & Sons, Public Works Supply, Ti-Sales, Vellano Bros., Women Waterworks Supply | |
| Bid #23-06 Water Meters Inventory [PDF] | November 23, 2005 | No | No | No | AMCO, Toomey, Neptune, Ti Sales | |
| Bid #24-06 Snow Removal Services [PDF] | November 15, 2005 | No | No | No | Gove, Health/ Wealth Ent., W. Renaud Trucking | |
| Bid #21-06 Skid-Steer Loader [PDF] | November 1, 2005 | No | No | No | Southworth -Milton Caterpillar | |
| Bid #13-06 Annual Tree Work [PDF] | October 14, 2005 | No | No | No | Urban Tree | |
| RFP #12-06 Water Source Augmentation Greenland Well [PDF] | October 13, 2005 | No | Yes | YES [PDF] | Underwood/ Emery & Garrett | |
| Bid #05-06 Madbury Water Plant Gates [PDF] | October 7, 2005 | No | No | No | Gc/AAA Fence | |
To view a [PDF] you will need Adobe Acrobat Reader: Download Here