Pavement Management

Project Description

(CIP TSM-94-PW-78 pg. 151-52) The Pavement Condition Management Program started in 1993. The review is conducted by Vanasse Hangen Brustlin, Inc. (VHB), surveying 25% of Portsmouth’s total 104.2-mile, City-maintained road network each year. In 2018, VHB performed a detailed inspection of the condition of the pavement on all the City maintained roads and created a database of information which can be viewed, edited and analyzed using VHB’s RoadManager™ software. The data is linked to the City’s Geographic Information System (GIS), so that thematic maps can be created to display any of the information in the database.

An annual report updating the city’s pavement management system is completed as part of this program. City road conditions are evaluated, the road network conditions and budget requirements are analyzed, and road-paving programs are developed. The report provides recommended funding to maintain street conditions at current levels. These are capital costs. They are implemented over a two-year period with an expected life of 20 years. The Public Works operational budget includes maintenance costs with an expected life of 10 years

2025:

These 2025 paving projects are listed in the approximate order the City would like them completed:

  • Peirce Island Road and Pool Parking Area
  • Church St
  • Kane and Alder Streets
  • Pinehurst and Lookout Lane
  • South End/Newcastle Ave Areas Micro-surfacing
  • Robin Lane
  • Pleasant Point Drive
  • Moebus Terrace
  • Boyan Place
  • Driftwood Lane
  • Baycliff Road
  • Ball Street
  • Fernald Court
  • Ridges Court
  • Humphrey’s Court
  • South School Street
  • Hancock Street
  • Gates Street
  • Deer St from Russell to Market
  • Deer St from Bridge to Maplewood
  • Portsmouth Indoor Pool Walkway
  • Gosling Road Pump Station

Project Manager:

Start:  April 1, 2025

Completion: Fall 2025

 

Read the full Pavement Management Index 2020 Update

Paving Projects Completed

Content

COMPLETED 

  • Top Banfield Road
  • Top Little Harbor Road
  • Dearborn Street final paving
  • Upper Court Street from Middle to Pleasant Streets
  • Pannaway Manor
  • Maplehaven Speed Tables
  • Mirona Road
  • Binder on Boyd Road
  • Elwyn Park phase 2 (Coolidge, Taft, Grant, Taft, Garfield from Hoover to McKinley and Nixon Park)
  • Top Bridge Street Parking Lot
  • Worth Parking Lot overlay
  • Middle Street & Middle Road intersection
  • Market Street from Bow Street to Market Square
  • Pease Tradeport: Corporate Drive
  • Middle Road from Urban compact to Peverly Hill Road
  • Dodge, Harvard, Princeton and Greenland Road Neighborhood
  • Greenland Road
  • South Street from Middle Road to Haven
  • Newcastle Avenue, Marcy Street area from South Street, east
  • Banfield Road
  • Dennett Street
  • International Drive
  • Corporate Drive
  • Bridge Street Parking Lot
  • Lang Road
  • New Hampshire Avenue (from International Drive to Pease Boulevard)
  • Maplewood Avenue (from Dennett to the railroad tracks)
  • Kearsarge Way and various spots in Atlantic Heights
  • Gosling Road
  • South Street
  • Greenland Road
  • Bow Street
  • Corporate Drive
  • International Drive

Crack Sealing

Content

The City's crack-sealing program helps prolong the life of road surfaces by keeping water out. Without the cost and inconvenience of full repaying, this approach maintains a smooth travel surface.

Status: Scoping for 2022 underway

Project Manager: Tobias Shea, Highway Foreman 766 - 1429

Estimated Start Date: Spring 2022

Estimated Time of Completion: Fall 2022

Estimated Cost: $75,000

Funding Source: Roadway Maintenance Funds

Designer/Contractor: TBD

 

Dave Desfosses
Dave Desfosses

Dave Desfosses

Construction Project Manager
(603) 766-1411
djdesfosses@portsmouthnh.gov
  • City of PORTSMOUTH Home >
  • Department of Public Works >
Portsmouth City Seal

Roads & Sidewalks

Office
680 Peverly Hill Rd, Portsmouth, NH 03801
Hours

Mon – Fri 7:30 AM – 3:30 PM

Phone
(603) 427-1530
Fax
(603) 427-1539

Public Works Operations

  • Roads & Sidewalks
  • Grounds Maintenance
  • Wastewater & Sewer
  • Water
  • Park Portsmouth
  • Transportation
  • Stormwater
  • Geographic Information Systems
  • Solid Waste & Recycling
Portsmouth City Seal

© 2024 - City of Portsmouth. All Rights Reserved. | Terms of Use